Steel Projects
-
Blast Furnace Closed Loop Cooling System - engineering, civil, electrical, piping & equipment setting
-
Annealing and Charging Furnaces - new construction, complete pipe and equipment setting
-
Cast House Pipe Replacement - project completed during furnace outage utilizing prefabricated pipe
-
Blast Furnace Top Change Outage Support
Industrial Projects
-
Gas Metering Station - new construction; civil, electrical, piping & equipment setting
-
Belt Filter Press - civil, electrical, piping & equipment setting
Power Projects
-
Feedwater Heater Replacement - 70 ton vertical vessel, utilized pre-engineered lifting plan and engineered lifting hoist, new concrete support piers
-
Tapping Sleeves on Circulating Water System - 4 inch connectors on 42in - 78in circulating water pipe (4 units)
-
Hot Reheat Partial Replacement - 18 inch diameter, schedule - 100, ASTM A335, P22
-
Coal Bunker and Chute Modifications - installed coal chutes under the Coal Hoppers, rebuilt corners with 3/8″ stainless steel , fabricated and installed new trapezoid shaped stainless steel plates in the bottom of 4-hoppers
Chemical Projects
-
Spiral Cooler - and associated piping replacement, replaced during outage
-
Hot Oil Heater Modifications
-
Acid Tubing Replacement
-
ASME Pressure Vessel - replacement of a 5.5 ft diameter x 86 ft tall vessel