Recent Projects

Steel Projects

  • Blast Furnace Closed Loop Cooling System - engineering, civil, electrical, piping & equipment setting

  • Annealing and Charging Furnaces - new construction, complete pipe and equipment setting

  • Cast House Pipe Replacement - project completed during furnace outage utilizing prefabricated pipe

  • Blast Furnace Top Change Outage Support

Industrial Projects

  • Gas Metering Station - new construction; civil, electrical, piping & equipment setting

  • Belt Filter Press - civil, electrical, piping & equipment setting

 Power Projects

  • Feedwater Heater Replacement - 70 ton vertical vessel, utilized pre-engineered lifting plan and engineered lifting hoist,  new concrete support piers

  • Tapping Sleeves on Circulating Water System - 4 inch connectors on 42in - 78in circulating water pipe (4 units)

  • Hot Reheat Partial Replacement - 18 inch diameter, schedule - 100, ASTM A335, P22

  • Coal Bunker and Chute Modifications - installed coal chutes under the Coal Hoppers, rebuilt corners with 3/8″ stainless steel , fabricated and installed new trapezoid shaped stainless steel plates in the bottom of 4-hoppers

 Chemical Projects

  • Spiral Cooler - and associated piping replacement, replaced during outage

  • Hot Oil Heater Modifications

  • Acid Tubing Replacement

  • ASME Pressure Vessel - replacement of a 5.5 ft diameter x 86 ft tall vessel